首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   32篇
  免费   7篇
  国内免费   13篇
力学   4篇
数学   48篇
  2020年   1篇
  2019年   2篇
  2018年   1篇
  2017年   1篇
  2016年   1篇
  2013年   3篇
  2012年   1篇
  2011年   2篇
  2010年   1篇
  2009年   2篇
  2008年   3篇
  2005年   1篇
  2004年   8篇
  2003年   7篇
  2002年   7篇
  2001年   1篇
  1994年   3篇
  1992年   1篇
  1991年   2篇
  1990年   2篇
  1985年   1篇
  1982年   1篇
排序方式: 共有52条查询结果,搜索用时 15 毫秒
1.
In the present paper, in the framework of three-dimensional linearized theory of stability (TDLTS) the statement of the problem of stability loss of a circular plate made from a viscoelastic composite material is suggested. The method for solution to these problems is developed by employing Laplace transform and FEM. It is assumed that the plate has an insignificant initial rotationally symmetrical imperfection. Stability is assumed to be lost when the imperfection starts to increase and grow indefinitely. Numerical results obtained by TDLTS are compared with corresponding results obtained in the framework of the third order refined plate theory.  相似文献   
2.
讨论无穷矩阵环上的导子,证明了环R上有限个元素不为零的无穷矩阵坏的每个导子均可表示为两个特殊导子之和。  相似文献   
3.
Single-Machine Scheduling with Release Times and Tails   总被引:1,自引:0,他引:1  
We study the problem of scheduling jobs with release times and tails on a single machine with the objective to minimize the makespan. This problem is strongly NP-hard, however it is known to be polynomially solvable if all jobs have equal processing time P. We generalize this result and suggest an O(n 2 log nlog P) algorithm for the case when the processing times of some jobs are restricted to either P or 2P.  相似文献   
4.
We consider the preemptive scheduling of n independent jobs on m unrelated machines to minimize the makespan. Preemptive schedules with at most 2m–3 preemptions are built, which are optimal when the maximal job processing time is no more than the optimal schedule makespan. We further restrict the maximal job processing time and obtain optimal schedules with at most m–1 preemptions. This is better than the earlier known best bound of 4m 2–5m+2 on the total number of preemptions. Without the restriction on the maximal job processing time, our (2m–3)-preemptive schedules have a makespan which is no more than either of the following two magnitudes: (a) the maximum between the longest job processing time and the optimal preemptive makespan, and (b) the optimal nonpreemptive makespan. Our (m–1)-preemptive schedules might be at most twice worse than an optimal one.  相似文献   
5.
A kind of GC′ surface constructing scheme on arbitrary triangular mesh is presented. The surface formed by this scheme can pass the given position vectors and take the given planes as its tangent planes at the vertices of the triangular mesh. Triangular mesh referred here is a set of space triangles and their faces such that the intersection of any two edges in this set is a vertex or an empty set.  相似文献   
6.
The concept of rigid sphericalt-designs was introduced by Bannai. He conjectured that there is a functionf(t, d) such that ifX is a sphericalt design in thed-dimensional Euclidean space so that |X|>f(t, d), theX is non-rigid. Furthermore, he asked to find examples of rigid but not tight sperical designs. In the present article we shall investigate the case whenX is an orbit of a finite reflection group and prove thatX is rigid iff tight for the groupsA n ,B n ,C n ,D n ,E 6,E 7,F 4,I 3.Research was partially supported by Hungarian National Research fund Grant No. 4267.  相似文献   
7.
Halin-图的邻强边染色   总被引:5,自引:0,他引:5  
图G(V,E)的正常κ-边染色f叫做图G(V,E)的κ-邻强边染色当且仅当任意uv∈E(G)满足f[u]≠f[v],其中,f[u]={f(uw)|uw∈E(G)},称f是G的κ-临强边染色,简记为κ-ASEC.并且x′as(G)=min{k|κ-ASEC of G}叫做G(V,E)的邻强边色数.本文研究了△(G)≥5的Halin-图的邻强边色数.  相似文献   
8.
The solutions of the equation in , where are investigated, Bessel potentials of higher order are defined, and recurrence relations between these solutions and these Bessel potentials are obtained. It is also proved that these solutions and the solutions of , under certain conditions, are identical. Received: 6 November 2002  相似文献   
9.
在煤码头和车站的煤堆积场上,煤粉的扬起是污染环境的主要原因之一.作者根据力学的基本原理,考虑颗粒和液滴重力、煤粉颗粒尺寸和湿度的影响,利用煤粉颗粒起动时的力平衡条件,推导出在风的作用下,具有一定湿度的煤粉颗粒开始扬起的起动风速的理论表达式.最后.根据煤粉起动速度与煤粉颗粒粒径及湿度的关系,将理论公式和风洞实验结果进行了比较,理论和实验结果符合得相当好.  相似文献   
10.
On the ground of wharf and a station where coal is piled up,the sources polluting theatmosphere are mainly the raised coal dust.According to the principle of mechanics,withthe consideration of the gravities of coal dust particles and liquid droplets,coal dust size andhumidity,under the condition of force balance when the coal dust was raised,the authorsobtained a theoretical formula for the threshold velocity of coal dust with humidity.Finally,the theoretical values from the formula gave a good agreement with the experimental datafrom some wind tunnels.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号